Skip to content Skip to footer

Case STudy

Efficiently installed in June 2017, a 1,600m-long Soluforce M570 6-inch pipe spans the seabed, linking the platform to the tanker in the Offshore North Malay Basin. This pipeline facilitates the transport of hydrocarbon condensate at 10 bar pressure, with installation completed just two weeks after the order was placed.

ClientHESSDateJune, 2017LocationOffshore North Malay BasinCaseInstallation of 1,600m long Soluforce M570 pipe (6-inch) on seabed - platform to tanker.Share

EMERGENCY RESPONSE

We support

  • Flowline & Riser Replacement
  • Engineering
  • Transport & Installation

Our purpose

  • Offer cost-effective, temporary solutions and expert support for quick rectification of compromised Flowline & Riser to minimize production loss.

EMERGENCY RESPONSE

We support

  • Flowline & Riser Replacement
  • Engineering
  • Transport & Installation

Our purpose

  • Offer cost-effective, temporary solutions and expert support for quick rectification of compromised Flowline & Riser to minimize production loss.

Emergency Hotline (24/7)

Go to Top