Case STudy
Efficiently installed in June 2017, a 1,600m-long Soluforce M570 6-inch pipe spans the seabed, linking the platform to the tanker in the Offshore North Malay Basin. This pipeline facilitates the transport of hydrocarbon condensate at 10 bar pressure, with installation completed just two weeks after the order was placed.






