Effectively performed an offshore in-field repair on February 2018 on a 1,600m-long Soluforce M570 6-inch pipe spans the seabed, linking the platform to the tanker in the Offshore North Malay Basin. This pipeline was damaged at 100 meters due to bad weather. The repair was completed within 2 days.